This project was completed in two stages. First the family room was constructed and the outside terrace was enlarged and covered in Chinese hard stone. The second stage saw the addition of two separate rooms. A storage area used for bicycles and a "bonus" room that has future potential as a home office. Chinese hard stone flooring was used in each room and for the second outdoor terrace. A large car port was added at the front of the house tied all the new construction elements together.
This project required architectural drawings, building permits and engineering reports.
You are viewing the text version of this site.
To view the full version please install the Adobe Flash Player and ensure your web browser has JavaScript enabled.
Need help? check the requirements page.